Bespoke, design-led architects working across Stanmore (HA3). We deliver contemporary extensions, whole-house renovations and new build homes tailored to the streets and planners of Stanmore.
Reviewed by Dor Cohen, RIBA Chartered Architect, ARB Registered

DOR Architects tests what your Stanmore property or site can achieve, designs a scheme that suits Harrow Council's planning policies, and prepares the drawings for approval and building. Our construction and development background keeps designs buildable and on budget, reducing the risk of refusals and costly redesigns.
Contents
Newsletter
Occasional case studies, planning notes and design ideas from our Stanmore projects.
Architecture in Stanmore
Period terraces and semis around Stanmore centre
Post-war infill closer to the HA3 boundary
Larger detached stock on the leafy northern edge
Mixed-use frontages along the main high street

Planning
Harrow's suburban character policies steer extension design towards subordination, pitched roofs and matching brick.
Planning a home project in Stanmore? Our house extension and loft conversion architects can help, or you can check whether your extension needs planning permission first.
Overlooking, daylight and sunlight typically tested at two-storey work.
Local SPDs set clear expectations on rear-extension projection.
Mature street trees and TPOs shape foundations and consent.
Most side-return and rear-extension projects trigger party wall notices — flagged upfront.
We tune brick, render and joinery to sit calmly within the existing streetscape.
Lifestyle, sustainability & value uplift

Lifestyle
Family-first spaces that flex from quiet mornings to Friday-night hosting — with real indoor-outdoor connection.

Sustainability
Fabric-first upgrades, MVHR-ready detailing and low-carbon materials baked in from Stage 2.

Value uplift
Well-considered extensions consistently outperform local price-per-sq-ft on resale.

Case study
Phoenix Canoe Club: a waterfront community building that achieved planning permission.
See the projectServices in Stanmore
Our services process
Site appraisal, planning strategy and a costed brief within four weeks.
BIM-led concept and options tested in three dimensions from day one.
Full planning submission with Design & Access statement and neighbour consultation.
Tender-ready technical package and on-site support through completion.
Why choose DOR
Everything you need to know about working with DOR Architects.
Many single-storey rear extensions fall under permitted development, but flats, conservation areas, Article 4 areas and larger or two-storey schemes usually need full planning permission. We check your address against local policy before you spend money on drawings.
Yes — we work across north London and Hertfordshire and design every scheme around the local council's policies and design guidance.
First sketch to completion is typically 12–18 months — 3–4 months design, 8–10 weeks for planning, then 6–9 months on site.
We keep a small, vetted list of contractors who consistently deliver in the area — we'll introduce you at Stage 3.
Transparent stage-based fees, shared as a fixed proposal after our first meeting — no hidden hourly billing.