South Hampstead · Camden
Planning drawings and applications for homes in South Hampstead (NW6), prepared for Camden Council with a clear strategy before you submit.
To get planning permission in South Hampstead you submit existing and proposed drawings, a site plan and supporting statements to Camden Council via the Planning Portal; householder applications typically take about 8 weeks to decide. We prepare the drawings and strategy and manage the submission.
General national guidance; every address is checked individually before design.
Camden's planners protect a dense mix of Georgian, Victorian and post-war fabric, with rigorous design guidance and daylight/sunlight tests.
Camden has many conservation areas and listed buildings, so roof, rear and basement work is often tested against detailed design guidance and daylight to neighbours. We design to the Camden Planning Guidance: Home Improvements.
Typical housing we see in South Hampstead:
We start remotely: a Matterport scan gives an accurate 3D model of your home, we design options you review on video calls, then produce concept drawings. Planning and Building Regulations drawings follow only if your project needs them.
Everything you need to know about working with DOR Architects.
The statutory target for householder applications is 8 weeks after validation, though councils can extend this. We build that into your timeline.
No — no architect can. We test your proposal against local policy and precedent first so you only submit a scheme with a realistic chance.
Our Stages 0–2 (survey, existing drawings and concept design) are offered as a fixed estimated fee; planning drawings (Stage 3) and Building Regulations drawings (Stage 4) are optional add-ons only if you need them.