St John's Wood · Westminster
Planning drawings and applications for homes in St John's Wood (NW8), prepared for Westminster Council with a clear strategy before you submit.
To get planning permission in St John's Wood you submit existing and proposed drawings, a site plan and supporting statements to Westminster Council via the Planning Portal; householder applications typically take about 8 weeks to decide. We prepare the drawings and strategy and manage the submission.
General national guidance; every address is checked individually before design.
Westminster's planners hold a high bar on materials, joinery detail and streetscape continuity, especially around St John's Wood.
Most of Westminster is in conservation areas, so even modest rear and roof alterations usually need full planning consent. We design to the Westminster City Plan and conservation area guidance.
Typical housing we see in St John's Wood:
We start remotely: a Matterport scan gives an accurate 3D model of your home, we design options you review on video calls, then produce concept drawings. Planning and Building Regulations drawings follow only if your project needs them.
Everything you need to know about working with DOR Architects.
The statutory target for householder applications is 8 weeks after validation, though councils can extend this. We build that into your timeline.
No — no architect can. We test your proposal against local policy and precedent first so you only submit a scheme with a realistic chance.
Our Stages 0–2 (survey, existing drawings and concept design) are offered as a fixed estimated fee; planning drawings (Stage 3) and Building Regulations drawings (Stage 4) are optional add-ons only if you need them.