Barnet planning permission: what the council really looks for

Barnet is our home borough, and we've learnt its habits the way you learn a neighbour's. It's fair, it's busy, and it cares a lot about the house next door. Get that right and most sensible extensions sail through.

Dor Cohen, RIBA Chartered Architect

Written by Dor Cohen, RIBA Chartered Architect, ARB Registered

Last updated

Extension to a house in North London

How does planning permission work in Barnet?

Barnet Council decides most householder applications against its Residential Design Guidance, which looks at light and outlook for neighbours, the scale of the extension against the house, and the character of the street. A householder application normally gets a decision within 8 weeks once validated. Homes in Hampstead Garden Suburb also need separate consent from the Hampstead Garden Suburb Trust, and conservation and Article 4 areas restrict what you can do without permission.

Leafy North London street of 1930s and Victorian brick houses
Planners always look at your house as part of its street.

What Barnet looks for

Barnet's Residential Design Guidance is the rulebook officers reach for. In plain English, it boils down to four questions.

  • Light and outlook for neighboursThe big one. An extension shouldn't leave next door's kitchen or garden in shadow, or make them feel boxed in.
  • Scale against the houseExtensions should look like a sensible addition, not a takeover. Depth, height and roof form all matter.
  • Street characterFront changes and side dormers get far more scrutiny than work at the back. Barnet likes streets to keep their rhythm.
  • Garden and treesKeeping a usable garden, and steering clear of protected trees, avoids a lot of awkward questions.

The areas that need extra care

Same borough, very different rules. Here's a rough map of where the extra hoops are.

WhereWhat appliesWhat it means for you
Hampstead Garden SuburbConservation area plus separate Trust consentEven small changes need consent; detailing is reviewed closely
Mill Hill Village and nearbyConservation areasMaterials and roof changes looked at carefully
Finchley Church End, Totteridge, Monken HadleyConservation areasFront and side changes are the sensitive ones
Article 4 streetsSome permitted development rights removedWork you could normally do freely may need an application
Most other Barnet streetsStandard planning rulesMany houses can use permitted development

How long it takes

Barnet aims to decide householder applications within 8 weeks of validating them. Validation itself can take a week or two, and an officer may ask for tweaks along the way. From first chat to a decision, allow around four to five months including design.

Why applications get refused

  • Too big next to a neighbourA deep or tall extension right on the boundary is the classic refusal.
  • Dormers that dominateOversized dormers, or anything big facing the street, rarely get through.
  • Thin drawingsOfficers can't approve what they can't understand. Clear, accurate drawings make a real difference.
  • Ignoring the streetDesigns that clash with a conservation area or the street's pattern get pushed back.
Most refusals we see aren't about bad ideas. They're about good ideas drawn without thinking about the house next door.
Dor Cohen, RIBA Chartered Architect

How we take you through it

  1. Check your address

    Conservation area, Article 4, Hampstead Garden Suburb, listed status. Our checker gives a first answer in a minute.

  2. Scan and 3D model

    A Matterport scan becomes an accurate model of your home and the neighbours' windows, so we can test light and outlook properly.

  3. Design to the guidance

    We shape the concept around what Barnet tends to approve, and tell you honestly where we're pushing it.

  4. Submit and manage

    Drawings, forms and supporting documents through the Planning Portal; we deal with the officer for you.

  5. Decision, then Building Control

    About 8 weeks after validation. Then technical drawings for Building Control and builders' prices.

Questions

Everything you need to know about working with DOR Architects.

  • The target is 8 weeks from the date the application is validated. Allow a week or two for validation, and longer if the officer asks for changes.